Skip to content
Lela HomelifeMassachusetts
Solar array on a new roof in Central Massachusetts.

Roofing

The roof first, if the roof needs it.

A roof keeps water out of the house. If you also want solar, it is the structure the array sits on. Our team coordinates repairs and replacements so those two jobs are not scheduled backward.

Explore
Solar array on a new roof in Central Massachusetts.

What this roofing work is

Lela Homelife coordinates full replacements and repairs. Coverings include architectural asphalt shingles, metal, and flat roofs. The right one depends on the slope, the deck, and what is already on the house.

A replacement is a tear-off when the existing layers or the deck call for it, then underlayment, flashing, ventilation, and the new covering. A repair is the right scope when one area is failing and the rest of the roof still has service life.

Storm damage can be photographed and written up so you can share it with your insurer. The claim result is between you and the insurer. The roofing scope is the work on the house.

How a replacement goes

Most residential replacements are measured in days, not weeks. One to three days is typical. Weather, deck repairs, and steep or cut-up roofs change that.

01

Look at the roof, not the brochure

Age, leaks, soft decking, pipe boots, chimney flashing, and ventilation. Shade trees that will matter for solar are noted in the same visit.

02

Choose the covering

Asphalt shingle, metal, or a flat-roof system. Warranties are the ones the manufacturer and the installing contractor put in the agreement for that product.

03

Protect the house during the work

A tear-off opens the deck. The crew stages the job so the house is not left open overnight when that can be avoided.

04

Flash and ventilate

Most leak callbacks start at flashing and penetrations, not in the middle of a shingle. Ventilation is part of the scope when the attic needs it.

05

Leave a surface solar can use

If solar is in the plan, the layout leaves paths for the array. If solar is later, the roof is at least new enough that the array is not sitting on a countdown.

What you get from doing it in this order

Water stays out

Leaks into the attic become insulation problems and ceiling problems. The roof is the first layer.

Solar does not have to come off

When a roof is already aging, replacement comes before panels. That is ordinary sequencing, not a package discount.

A repair when that is enough

Not every stain on the ceiling is a full replacement. The visit is supposed to tell the difference.

One schedule

If both roofing and solar are real, our team puts them in one sequence and you are not refereeing two companies.

Ready for a look at this house? Enter the address. It opens the home check.

The order

Roof, then solar, if both are in the plan.

Same house, right order

Solar waits on a tired roof. A sound roof does not wait on solar.

Our team’s job is to say which of those is yours. The solar page has the bill dial. This page is the roof under it.

Open the solar dial
Solar array on a new roof in Central Massachusetts.
Solar + new roof, Central MA

The process with Lela

Drag the handle, or swipe the step.

1

Step 1 of 4

Check my home

Tell the home check the roof is part of the question. Leaks, age, and whether solar is also on your mind are the useful details.

The next step is the home check. One form, no second form.

Ways the roof can be handled

These are scopes, not promotions. Financing, if a proposal includes it, is whatever the written agreement says.

Repair

Targeted work when the rest of the roof can stay. Flashing, a few slopes, or a penetration.

Replacement

A new covering, with the deck and flashing brought up to what the new system needs.

Roof, then solar

Both jobs, in that order, when you want panels and the roof will not outlast them. Each job keeps its own price.

Related work

The roof sits next to other projects. They stay linked so the order is obvious.

Solar

See how an array is sized, and why direction and shade matter, before panels go on a new roof.

Explore

Trees and shade

Limbs over the ridge are a roofing problem and a solar problem. Tree work is coordinated, not assumed.

Explore

Insulation under the roof

Once the roof is tight, the attic is the next place heat leaves. Insulation is its own Mass Save conversation.

Explore

Electrical gear on the roof

The service mast and the conduit path are easier to plan while the roof is open.

Explore

Questions homeowners actually ask

If the roof is near the end of its service life, yes. Panels that have to come off for a later tear-off cost a second mobilization. If the roof is sound, solar can go on it.

Both. A repair is the scope when that is what the roof needs. A replacement is the scope when the covering or the deck is done.

Architectural asphalt shingles, metal, and flat-roof systems. The proposal names the product. Warranty terms are the ones attached to that product and that installer.

Many houses are done in one to three days. Decking repairs, weather, and complicated roofs take longer. The schedule in the agreement is the one to plan around.

No. Roof work is priced as roof work. A solar lease or power purchase agreement does not make the roof part of that contract.

The roof can be documented so you have photos and a scope to share with your insurer. Payment of a claim is the insurer’s decision.

If the roof and the solar are both real, do them in order.

Check my home and say which one you are looking at. Our team will tell you if the roof has to go first.